Material Production and Sampling
Pugmill Blending
Subbase Preparation
Geotextile and Geomembrane transport to Job Site
Construction of Divider Curbs
Finished Divider Curbs
Side Trenches
Geomembrane Liner Installation
Russ Villegas from Hallaton Helping us installing the geomembrane liner
Installing the Pipe Boot
Finished Pipe Boot
Side Trench with Liner
Installing VDOT UD-4
VDOT UD-4
Installing Lysimeter Pan
Lysimeter Pan
Pipe Outlets and Risers
Placement of Rock Base (RCA, V.A. and Blends)
Moisturizing and Compacting the Base Course
Instrumentation of Sections
Instrumentation cables running alongside the test road
Compaction Quality Control
Downhill Concrete Pad
Collector Tansk
Connecting Pipe Outlets to the Tanks
Placement of Asphalt
Sampling for Density and Permeability Tests
Data Collection System
Installed Weather Station
VDOT Mt. Crawford Team
Finished Test Road